BIBLIOTECA MANUEL BELGRANO - Facultad de Ciencias Económicas - UNC

Imagen de Google Jackets

Argentina : El Niño emergency flood project

Por: Colaborador(es): Tipo de material: TextoTextoSeries Technical annex ; no. T 7209 ARDetalles de publicación: World Bank; Washington, D.C.; December 1997Descripción: ii, 67 p. + anexo grafs., tbls., ilTema(s): Clasificación CDD:
  • 353.95 B 47556
Contenidos:
Incluye anexo: Memorandum and recommendation
Resumen: The objective of the El Nino Emergency Flood Project is to offset the damaging impact of El Nino in: i) six northwestern provinces and three Cuyo provinces; and ii) seven littoral provinces through additional works above and beyond the Flood Protection Project. The project has been designed with two geographical components: one for the six northwestern provinces and the three Cuyo provinces, and another for the seven participating littoral provinces. A third component is designed to strengthen the administrative and technical capacity to coordinate the implementation of the project. The operation will be implemented in two phases: 1) a protection phase of 12 months for the northwestern provinces, which includes acquiring of goods and execution of works for emergency river flood control; and b) a rehabilitation phase for both geographic regions, which includes transport infrastructure, drainage systems, education and health facilities. In addition, there is a capacity-building subcomponent for the northwestern provinces to manage flood emergencies and a small scale housing subcomponent for housing reconstruction.
Existencias
Tipo de ítem Biblioteca actual Signatura topográfica URL Estado Fecha de vencimiento Código de barras
Libro Libro Biblioteca Manuel Belgrano 353.95 B 47556 (Navegar estantería(Abre debajo)) Enlace al recurso Disponible 47556

Incluye anexo: Memorandum and recommendation

Incluye bibliografía

Incluye anexo: Memorandum and recommendation

The objective of the El Nino Emergency Flood Project is to offset the damaging impact of El Nino in: i) six northwestern provinces and three Cuyo provinces; and ii) seven littoral provinces through additional works above and beyond the Flood Protection Project. The project has been designed with two geographical components: one for the six northwestern provinces and the three Cuyo provinces, and another for the seven participating littoral provinces. A third component is designed to strengthen the administrative and technical capacity to coordinate the implementation of the project. The operation will be implemented in two phases: 1) a protection phase of 12 months for the northwestern provinces, which includes acquiring of goods and execution of works for emergency river flood control; and b) a rehabilitation phase for both geographic regions, which includes transport infrastructure, drainage systems, education and health facilities. In addition, there is a capacity-building subcomponent for the northwestern provinces to manage flood emergencies and a small scale housing subcomponent for housing reconstruction.

No hay comentarios en este titulo.

para colocar un comentario.

Bv. Enrique Barros s/n - Ciudad Universitaria. X5000HRV-Córdoba, Argentina - Tel. 00-54-351-4437300, Interno 48505
Horario de Atención: Lunes a Viernes de 8 a 18

Contacto sobre Información bibliográfica: proinfo.bmb@eco.uncor.edu