000 | 01540npm a2200277 a 4500 | ||
---|---|---|---|
003 | arcduce | ||
005 | 20220614120156.0 | ||
007 | t| | ||
008 | 140902s2003 nju||||| |||| 00| 0 eng d | ||
020 | _a0471406724 | ||
040 |
_aarcduce _carcduce |
||
082 | 0 |
_a658.403028 _221 |
|
100 | 1 | _aChang, Yih-Long | |
245 | 1 | 0 |
_aWinQSB version 2.0 / _cYih-Long Chang, Kiran Desai. |
260 |
_aHoboken, N.J. : _bJ. Wiley, _c2003 |
||
300 | _a230 p. | ||
505 | 0 | _a1. Introduction to Win QSB -- 2. Linear programming (LP) and integer linear programming (ILP) -- 3. Linear goal programming (GP) and integer linear goal programming (IGP) -- 4. Quadratic programming (QP) and integer quadratic programming (IQP) -- 5. Network modeling -- 6. Nonlinear programming (NLP) -- 7. Dynamic programming (DP) -- 8. Project scheduling: PERT-CPM -- 9. Queuing analysis (QA) -- 10. Queuing system simulation (QSS) -- 11. Inventory theory and systems (ITS) -- 12. Forecasting (FC) -- 13. Decision analysis (DA) -- 14. Markov process (MKPA) -- 15. Quality control charts (QCC) -- 16. cceptamce sampling analysis (ASA) -- 17. Job scheduling (JOB) -- 18. Aggregate planning (AP) -- 19. Facility location and layout (FLL) -- 20. Material requirements planning (MRP). | |
650 | _aPROGRAMAS DE COMPUTADORA | ||
650 | 4 | _aADMINISTRACION | |
650 | 4 | _aTOMA DE DECISIONES | |
650 | 4 | _aPROGRAMACION MATEMATICA | |
650 | 4 | _aPROGRAMACION LINEAL | |
700 | 1 | _aDesai, Kiran | |
942 |
_cLIBR _2ddc _j658.403028 CH 49314 |
||
945 |
_aNM _c2022-06-14 Modificado |
||
999 |
_c17716 _d17716 |